Pre-fabrication Maintenance

- Detailed isometric Sketches (ISOGEN) preparation
- Detailed BOM (Bill Of Materials) preparation for pre-fabrication
- Piping, pumping groups, MSH, high and medium pressure collectors pre-fabrication
- Support frame for equipment and piping pre-fabrication
- Systems and equipment installation, pre-fabricated materials installation, insulation
- Pumps, control valves, instrumentation, heat exchangers and condensers maintenance
- Steam and condensate pipe maintenance and revamping
- Mechanical and plants maintenance contracts
We have in our staff, specialized and certificated personnel for construction, pre-fabrication and maintenance jobs of steam lines and pressure equipment. SAM Progetti has worked in high and medium pressure steam distribution plants, in -9,6 m vacuum systems, in co-generation and technological plants.